Building relationships from underground up

See our capabilities
  • We are hiring

    We are currently accepting applications. Visit our job opportunities page for information and to apply.here.

  • ROAD CLOSURE 12th Street, The Dalles

    Crestline Construction has been contracted by The City of The Dalles to provide storm, sidewalk, and roadway reconstruction on E 12th Street between Thompson and Richmond. Construction will commence on Monday, March 10th, 2025, and run to late September 2025.
    Road closures and detours will be in effect throughout the duration of the project with only local access being allowed on E 12th street between Thompson and Richmond, depending on major excavation activities local thru traffic will be limited. Crestline Construction recommends residents pay attention to site traffic control and onsite personnel directions.
    Please avoid the area and use alternate routes to access either ends of the project by using 10th street, 14th St or Morton St to navigate around the work zones. We appreciate everyone’s patience and understanding as we construct these City of The Dalles Improvements.

  • ROAD DETOURS AND CLOSURE 6th Street, The Dalles

    Starting April 21st, the southbound lane of 6th Street between Pomona St W and the intersection ending before the Southern entrance to Coastal Farm and Ranch will close, with the detour using Pomona to W 7th St to Myrtle St then back onto W 6th Street. A Road Closed Local Access Sign will be posted at Pomona allowing for access to businesses South of Pomona to ASTRO to remain open and accessible but there will be no thru traffic between Pomona and Snipes ST. The Northbound Lane on W 6th Street will remain open with traffic speeds reduced to 25MPH. Estimated closure is 3 weeks.
    Crestline Construction recommends motorists use alternate routes, obey site traffic control and be aware of the increased construction equipment and activity throughout the duration of the project. We appreciate everyone’s patience and understanding as we construct these City of The Dalles Improvements.

Get the job done right.

over 26 years of experience and hundreds of projects.

Crestline is a general contractor specializing in complete site preparation, utilities, mass excavation, and highway and road construction. Established in 1994 and based in The Dalles, Oregon, our resume includes both public and private works projects throughout the Northwest. We put our staff first and have a safety track record that speaks for itself. With a highly skilled workforce of over 70 employees, we have the personnel and equipment to successfully complete projects of varying scope and size.

See our equipment >

Fully equipped.

We own and maintain a large fleet of late-model equipment to fit our clients’ needs. With over 150 pieces of rolling stock, we have the machinery needed to get the job done right, no matter how big or small.

See our equipment
Get to know our crew >

Meet our crew.

Our dedicated and highly skilled workforce has a common interest in reaching and exceeding our clients’ expectations. We put safety and know-how first and foremost with our staff. Any contractor can purchase the same materials and similar equipment as we can, but it’s our people that make the difference.

Get to know our crew
Proud Gorge Residents & Stewards >

Community trust.

“I have never worked with a contractor and his crews who have done such a nice job from start to finish. They have gone out of their way to produce an extremely clean and useful project.”

—MICHAEL KUKES, Civil Engineer, Horizon Wind, Inc.

Proud Gorge Residents & Stewards

Safety first.