Wyeth Trailhead to Lindsey Creek

Historic Columbia River Highway

I-84 Right Lane closures will continue Monday through Thursday between MP 52 to 53.

No closures will be allowed the afternoon of
8-17, and all day 8-18 through 8-23 for the solar eclipse.

The work consists of one viaduct and two bridges; mechanically stabilized welded wire walls, bin walls, and tie-back walls; rock fall protection fencing, netting, and rock bolting; controlled blasting and grading; aggregate base and paving; drainage improvements; parking lot, restroom and kiosk; stone masonry, exposed aggregate sidewalk, and decorative steel and cable railings; waterline; guardrail, signing and striping; and I-84 traffic control and cross-over installation and other small items of work.

Additional project information and current details are available here

  • Placing of West Abutment

  • Tree and Brush Clearing

  • Gordon Creek West Abutment